





·安装完毕后的试压工作,试验压力为工作压力的1.5倍,且压力值不得小于0.6MPa,测试时间约20-30分钟。
·管材安装要遵循“水走天”原则,避免后期维护损害管道。
·安装过程中要及时封住管材开口处,避免杂物进入管道系统
Tips for PPR tube installation
·After installation,ppr 管, the test pressure is 1.5 times of the working pressure, and the pressure value shall not be less than 0.6MPa, and the test time is about 20-30 minutes.
·Pipe installation chould follow the principle of "water goes to the sky" to ***oid damage to the pipe during later maintenance.
·In the process of installation, the opening of the pipe should be sealed in time to ***oid impurities entering the pipe system

ppr管安装的小窍门
ppr管材管件连接时,ppr管件,应在墙壁上表上记号和位置,方便日后管道的维修,尽量避免管子暴露在外面,以免受碰撞而损坏。
ppr管冷水和热水管需要分开槽来安装。
Tips for PPR tube installation
When connecting PPR pipes and fittings, marks and place should be marked on the wall to facilitate future pipeline maintenance, and the pipes should not be naked to the outside to ***oid damage caused by collision.
PPR pipe cold water and hot water pipe need separate tank to install.

在熔管的时候,先用PPR管剪刀切好ppr管。切割时要把管子断面尽量剪平,没有毛边和毛刺,管材和管件连接端面必须清洁,潜江ppr管,干燥、无污染,否则会影响熔接效果。并在管材熔接口标上熔接深度线。
When melting the pipe, first cut the PPR pipe with PPR pipe scissors. When cutting, the cross-section of the pipe Try to cut it flat without burr and burr. The connecting end face of the pipe and fittings must be clean, dry and pollution-free, otherwise the welding effect will be affected. And the welding depth line is marked on the pipe welding joint.

ppr管件-Gafloon-潜江ppr管由台州艾菲力塑胶有限公司提供。台州艾菲力塑胶有限公司为客户提供“塑料制品(不含塑料桶),橡胶制品(不含橡胶桶),阀门”等业务,公司拥有“Gafloon卡弗龙”等品牌,专注于塑料管等行业。,在浙江省台州市三门县西区开发区的名声不错。欢迎来电垂询,联系人:郑总(Rainy)。同时本公司还是从事PPR管,地暖管,PVC管的厂家,欢迎来电咨询。