主要表现形式:受力部位不同而产生不同情况的,管材主要在搬运或施工中受外力强冲击所致。一般外表不易察觉,常出现在管件连接处,让人误认为是焊接质量问题或其他。因在外部受力,PVC水管电话,裂缝外紧内张,一般还能承受2-4KG的供水压力,误以为焊接质量存在问题。有时用户在管道通水后短期内没有发现漏水线下,一段时间后才漏水。管道在连接前,端部宜去掉受损部分,青浦区PVC水管,安装完毕及时做好管道的水压试验。

ppr管热熔操作
热熔器接通电源,到达温度指示灯亮后方能开始操作。
切割管材必须使端面垂直于管轴线,管材切割一般使用管子剪,如为大管径,则用锯条切割,切割后断面去毛刺和毛边。
Hot melt operation of PPR pipe
The heat melt can be operated after the power is turned on and the temperature indicator light is on.
The end face of the pipe must be perpendicular to the pipe axis. Pipe cutting is generally used. If the pipe diameter is large, it is cut with a saw blade. After cutting, the sected shall be deburring and burr free.

在熔管的时候,先用PPR管剪刀切好ppr管。切割时要把管子断面尽量剪平,没有毛边和毛刺,管材和管件连接端面必须清洁,干燥、无污染,否则会影响熔接效果。并在管材熔接口标上熔接深度线。
When melting the pipe, first cut the PPR pipe with PPR pipe scissors. When cutting, the cross-section of the pipe Try to cut it flat without burr and burr. The connecting end face of the pipe and fittings must be clean, dry and pollution-free, otherwise the welding effect will be affected. And the welding depth line is marked on the pipe welding joint.

PVC水管电话-Gafloon卡弗龙-青浦区PVC水管由台州艾菲力塑胶有限公司提供。行路致远,砥砺前行。台州艾菲力塑胶有限公司致力成为与您共赢、共生、共同前行的战略伙伴,更矢志成为塑料管具有竞争力的企业,与您一起飞跃,共同成功!同时本公司还是从事PPR管,地暖管,PVC管的厂家,欢迎来电咨询。