匀质防火保温板外墙外保温系统工程施工期间及完工后24h内,基层及施工环境温度应不低于5℃,夏季应避免阳光曝晒。在5级以上大风和雨雪天气不得施工。匀质防火保温板上墙后应及时进行抗裂防护层施工,抗裂防护层施工前,匀质防火保温板严禁受潮、雨淋。
匀质防火保温板外墙外保温系统工程施工前,应在现场采用相同建筑节能设计的材料、构造做法和工艺制作样板墙,经具备相应资质的检测单位检测合格,并由有关各方验收确认后方可进行大面积施工。
匀质防火保温板外墙外保温系统工程的下列部位应做保温防水处理:
1水平或倾斜的出挑部位;
2外墙上的任何附着件连接部位;
3墙身变形缝、系统变形缝和分格缝等部位;
4幕墙收头、勒脚、门窗洞口、保温层收口处、托架等部位。

轻匀质保温板制作流程
Production process of light uniform quality assurance temperature plate:
1. Raw materials such as cement and fiber are proportioned and pulped by the proportioning system, so that the raw materials are fully mixed and kept uniform.
2. Transport the slurry to the slurry storage tank, keep stirring to keep it uniform, send the slurry to the slurry storage tank and then to the headbox, and mix in the headbox to keep uniformity.
3. The billets fall off from the slurry forming cylinder, and are transported to the irrigation cutting place by the billet receiving machine. The longitudinal cutting edge of the billets is cut by the cutter. The residual materials are transported to the return mixer by the billet receiving machine, and then transported to the slurry storage tank for reuse after being stirred by the mixer.

匀质板的施工条件和环境
荣锦匀质板为您简单介绍施工条件与环境:
基层墙体:经过工程验收达到***验收质量标准的结构承重墙面或非承重墙面在找平层施工完毕后,待找平层干燥并已验收合格,即可进行外墙外保温施工。
门窗口:门窗洞口经验收,洞口尺寸位置达到设计和质量要求。
窗的保温:门窗的保温要按要求做特别的处理,应严格按照设计要求施工。
伸缩缝和装饰缝:伸缩缝的蕞大间距应符合图集的要求或与设计单位协商确定。
预埋管道:与外墙有关的管线、预埋件、支架等已安装到位,并预留出外保温的余地。
环境条件:施工现场环境温度和基层墙体表面温度在施工及施工后24小时内均不得低于5℃,风力不大于5级,雨天不能施工。