为所有人提供工程图纸依法追究特殊密封,和***终的图纸。
7.1基本要求
安装7.1.1在这部分的实现合同当事人的报价所提供的设备进行检验和性能测试实验,确保报价所提供的设备符合技术规范的要求。设备和它的主要组件是按照***有关标准进行类型测试,因素
A. battery capacity conversion curve
B. for 5 seconds and 1 minute discharge characteristic curve
C. Float charging pressure and temperature curve
D. Floating battery life and temperature curve
E. Different ratio for battery discharge impulse discharge current curve after 1 hour
F. Different ratio for battery discharge impulse discharge current curve after 0.5 hours
G. Battery capacity and discharge time curve
H. Different battery discharge rate, voltage and time relation curve
For all provide engineering special seal shall be affixed to the drawings, and for the final drawings.
7.1 the basic requirements
7.1.1 during this part for the implementation of the contract party to the quotation of the equipment supplied by inspection and performance test experiment was carried out, ensure the equipment to be provided by quotation in compliance with the requirements of the technical specification. Equipment and its main components are conducted in accordance with relevant state standard type test, factory test, all kinds of test are conducted according to relevant standa*** and regulati*** of the state. Each group, all battery factory experiment was carried out, and to provide a complete test report and factory test reports and test acceptance criteria.
7.1.2 offer party shall within one month after the contract comes into force, to make an inquiry in connection with this contract equipment to be supplied by inspection, performance acceptance test criteria, and in the test report will be a month ago test standa***, plans and reports to send inquiry party inspection. Relevant standa*** shall comply with the provisi*** of the technical specification.
7.1.3 offer will match all equipment field test of the machine.
7.1.4 inquiry think a test condition, content, procedure, measure and record any item is not in conformity with the relevant requirements, shall h***e the right to refuse to accept the test report to redo the test.
7.1.5 inquiry party shall h***e the right to send personnel to offer party factory, test site and laboratory equipments and its main components manufacturing, assembly, testing and debugging of the production process such as spot check.
7.1.6 inquiry staff put forward the relati***hip to the problem of equipment quality, price will reply within 1 week.
7.2 the factory inspection and test
7.2.1 quoted battery is required to provide a full range of equipment type test, factory test, the commissioning test report, test programs, content, methods, standa*** and other requirements, in accordance with the relevant countries and the electric power industry standard specification. Battery delivery until they h***e passed the test before they go out. The type testing shall not be less than the following items:
A) 10 h rate capacity test
B) the accident impact discharge test
C) discharge characteristic curve test
D) open circuit voltage test
E) pressure drop test
7.2.2 before delivery test items include:
A) polarity test
B) the open circuit voltage test
C) 10 h rate capacity test
D) the acid mist performance
E) safety performance test
7. 3 field test
Equipment in the field after installation, test according to related standa***. Test results and conform to the state and the mechanical ministry standard requirements.